1. When stopping work in a short period of time, give a small amount of air pressure to prevent sediment from intruding into the drill rig impactor. If the rig is stopped for a long time, the impactor should be lifted 1-2 meters away from the bottom of the hole to fix it.
2. Always pay attention to check the lubricating oil condition of the wind motor.
3. When the working surface is immersed in water, use a large-diameter drill bit to insert the drill rod when opening the hole, so that the drill rod is 1-2 meters above the water surface to prevent mud and slag from falling into the hole.
4. It is not allowed to reverse at noon during drilling operation to prevent the drill rod from falling into the hole;
5. Always pay attention to check the water and air pipelines of the crawler drilling rig, and whether the bolts and nuts of each accessory are firm.
The last one:Hoisting machine type 50 drilling rig | Next item:Hoisting machine type 50 drilling rig |